Vol. 9, Issue 11, 1955November 01, 1955 PDT
ccby-nc-nd-4.0
Cling peach cannery losses: Pilot plant tests with equipment designed to minimize losses in pitting and peeling operations indicate reduction in costs
Cling peach cannery losses: Pilot plant tests with equipment designed to minimize losses in pitting and peeling operations indicate reduction in costs
J Foytik, S Leonard, B Luh,
Foytik, J, S Leonard, and B Luh. 1955. “Cling Peach Cannery Losses: Pilot Plant Tests with Equipment Designed to Minimize Losses in Pitting and Peeling Operations Indicate Reduction in Costs.” California Agriculture 9 (11): 5–16.